Factory OS
Production planning and task management for a tier-1 apparel manufacturer — replacing Excel with automated milestone planning, SOP gate enforcement, and real-time visibility.
// Production planning — milestone timeline, SOP gates and live capacity
Figures from the engagement, shared under NDA.
We publish them unchanged and can’t break them down any further here. The reference build you can open runs entirely on sample data.
What it does — and which part of it we built.
Full-stack production planning system with dual-track milestone engine (date-triggered + event-triggered), 9 mandatory SOP quality gates, capacity simulation with what-if scenarios, Gantt chart visualization, and role-adaptive dashboards.
Seeded with 295 real production orders across 9 departments.
Every screen here is from the reference build, not the client’s system.
The captions say what you are looking at. Every name and record on them is sample data.


The stack was picked per constraint, not per house habit.
5 technologies across 3 layers — the shape of the stack follows the problem.
Every feature in the build (6)
- Dual-track milestone engine: Track A (CRD offset dates) + Track B (event-triggered by GRN receipt)
- 9 mandatory pre-cutting SOP quality gates with evidence uploads and override tracking
- Capacity engine: production day calculation, LPCD computation, what-if simulation with overtime
- Custom Gantt chart, FullCalendar integration, Kanban + table task views
- 14 routes, 31+ API endpoints, Excel import via SheetJS, Recharts analytics
- GitHub Actions CI: lint, typecheck, test, build
Don’t take our word for it — it is running in the frame below.
This is the same page the provenance block links to: our reference build for Factory OS, with its own look, copy and motion. Scroll inside it, or open it full-screen.
// next
Building something in this space?
A 30-minute call is enough for us to understand your situation and tell you whether we're the right team. Usable version in the first two weeks if we are.