// solutions

AI for Manufacturing & Industrial Vision

BuildspaceLabs builds AI for manufacturing and industrial teams: on-premise video analytics for PPE compliance, boundary surveillance, and intrusion detection, plus production planning that replaces spreadsheets with automated milestones and SOP gate enforcement. Our industrial vision runs fully on-premise — no cloud required.

// where teams get stuck

We start from the failure, not the technology

These are the manufacturing problems the builds on this page were commissioned to fix. If none of them describes your week, we are probably not the right team.

  • Safety and PPE compliance depend on someone watching camera feeds all day
  • Production planning lives in spreadsheets that go stale the moment they are saved
  • Cloud video is a non-starter on a secure factory floor
  • No real-time view of whether the floor is on-plan
// what we build

Everything on this list is already built

4 capabilities, each one taken from a manufacturing system we have delivered — not a menu of what we could attempt.

  • On-premise video analytics — PPE compliance, surveillance, intrusion detection
  • Production planning with automated milestones and SOP gate enforcement
  • Real-time factory-floor visibility replacing spreadsheet workflows
  • Edge deployment with no cloud dependency
// the work itself

The builds behind those claims

2 builds delivered for manufacturing teams, under NDA. What you can open is our own reference build of each, with sample data in place of the client’s: 2 are navigable screen sets with no live backend.

// questions

What manufacturing teams ask us first

Short answers, each one tied to a system we have shipped. The first is open; the rest are one click.

How does AI help on a factory floor?

Computer vision watches for PPE compliance and boundary/intrusion events in real time, and production planning replaces spreadsheets with automated milestones and SOP gates. BuildspaceLabs has shipped both — and the vision runs fully on-premise.

Does the video analytics run on-premise?

Yes — our Open Vision PPE system runs fully on-premise with no cloud dependency, which matters for secure industrial sites and factory floors.

What manufacturing products have you built?

Open Vision PPE for on-premise safety and vision, and Factory OS for production planning, automated milestones, and SOP-gate enforcement.

The other 19 industries we build for

Have a project in this space?

Tell us where you are in a sentence or two. We'll tell you honestly whether we're the right team — and what the first scope would look like.

Start the conversation